The power plant has been put into operation in 1995 to generate steam, electricity and hot water to industrial site in Europe. New biomass boiler will be constructed to site during 2012 and GT unit will be stopped.
The plant has been continuously operated with relatively low number of starts and has excellent availability records . The main fuel has always been clean natural gas . Distillate operation is currently blocked and fuel nozzles converted to gas only. The combustion hardware has been upgraded with wear kits to reduce the unit maintenance time. The Gas Turbine has been under the OEM service agreement since beginning and full maintenance history is available. Purchaser can also benefit from preventive maintenance programs in use and possibility to familiarise his personnel in operational plant.
The plant is currently in full commercial operation. Next maintenance outage (Combustion Inspection ) is planned to be carried out in autumn 2011, after the operation is planned to be fully stopped in June 2012, when new biomass boiler is ready for commissioning. Visits to site for equipment inspection can be arranged at your convenience.
The equipment is offered for sale on an “as-is and where-is“ basis on manufacture and repair defects, normal wear and tear or fitness for purpose. Purchaser will be responsible for the removal of the equipment in entirety including disconnection and capping of all pipes and cables according to Sellers site and safety rules.
The equipment is subject to prior sale, but can be reserved by a non-refundable down payment. Remaining shall be paid prior to the commencement of the works and entry of the Purchaser onto the site according to the dismantling schedule.
Following provides the general description and list of main equipment subject to sale. Though the statements and technical information contained herein are believed to be materially accurate as of the date hereof, no representation or warranty is given as to the accuracy of any of the information provided. The information referred to herein is subject to change.

|
Type |
PG-6541 (B) |
|
Manufacturer |
Thomassen |
|
Commissioned |
1995 |
|
Fuel |
Dual fuel: Natural Gas / Fuel Oil |
|
Rated output base load NG |
41326 kW (0 ºC, 1033 mbar) |
|
Rated simple cycle efficiency |
32.2 % |
|
Combustion system |
DLN-1 ( < 25 ppm NOx / NG base load) |
|
Control System |
GE MARK V Speedtronic TMR |
|
Reduction gear |
5114 / 3000 rpm, Flender TRL65CV |
|
Operating hours (06/2011) |
125 000 fired hours (232 starts) |
|
Last overhaul |
HGPI @ 2010 / 118 350 hours |



|
Assessory gear |
Flender, AA51AA |
|
Starting motor |
ABB, AHM 355 L2D 475 kW/6.3 kV |
|
Torque Converter |
Voith, E 6 wat |
|
DC Battery |
56 x 2C300 |
|
DC Charger |
Saft-Nife, 110V / TPR 50A /380 V |
|
GT Fire Protection System |
Ajax, PZ 300 21 x 250 bar/67 l CO2 cylinders |
|
GT Inlet Air Filter |
Donaldson GDX77 Pulsed air Cartridges |
|
Closed Cooling Water System |
2 x pumps and 2 x Alfa Laval plate heat exchangers |
|
GT Water Washing Unit |
Nijhuis, On-/Off-line |
|
Fuel Oil System |
450 m3 tank, forwarding pump, dublex filter, heating, metering |
|
Fuel Gas System |
Gas compressor , preheating and pressure reduction station and |
|
Spare parts |
2nd set of GT capitals (used), various consumables |
|
Special Tools |
As per GT delivery |
|
Documentation |
Two sets of O&M manuals in English |


|
Manufacturer and Type |
ABB GTL 1200 EP, IEC 34, Closed air / circuit water cooled |
|
Rating |
52 800 kVA, 0.90 power factor 3000 rpm / 50 Hz, 11 000 V +/- 5% |
|
Exitation type |
GDL520C, Brusless, 130 V, 6.5A |
|
Last major overhaul |
2007 |
|
Lubrication |
Common with GT |
Control and Protection System, 20 m long busbars and Generator circuit braker included


|
Manufacturer |
ABB |
|
Type |
Oil immersed ,three phase |
|
Rating |
50 MVA, Xk 12,1% |
|
Low Voltage / High Voltage |
11 kV / 110 kV ± 9x1,67% |
|
Connection |
YNd1 |


600 m 110 kV cable included
|
Commisioned |
1995 |
|
Type |
2-pressure level, natural circulation horizontal gas path, with natural gas |
Rated output, A = GT on base load / B = GT on base load + supplementary firing
| A | B | |
|
Supplementary firing MW |
0 | 40 |
|
Flue gas flow kg/s / inlet ºC / exit ºC |
146 / 526 / 80 |
146.7 / 750 / 80 |
|
HP steam generation kg/s / ºC / bar |
17.2 / 500 / 84 |
32.3 / 500 / 84 |
|
LP steam generation kg/s / ºC / bar |
2.7 / 230 / 19 |
1.4 / 230 / 19 |
|
Hot water generation kg/s / in ºC / out ºC |
56.1/ 65 / 120 |
33.3 / 65 / 120 |
|
Feed water temperature ºC |
90 |
90 |
Auxiliary systems included:
All Enquiries can be made using the following Email-Address:
This email address is being protected from spambots. You need JavaScript enabled to view it.
Note: Cess will scrutinise every incoming Email prior to passing them on to the owners.